An Engineering Solution Provider for Semiconductor Facilities.

We are a team of Professionals each with demanding work experience

Our Services

The service what we offer is specially designed to meet your needs

Green Field Semiconductor Facility

Concept design to Detailed Design engineering services covering Architectural , Structure, Cleanroom, Process Utilities, Mechanical Systems, Process Exhaust Systems. Fire Protection, Electrical, Life Safety Systems and Authorities JTC,URA,FSSD,NEA Approval.

Existing Semiconductor Facility Expansion

Full scope design covers Civil, Structure and Architecture including JTC/URA/FSSD/NEA approval

Bulk Gas Systems

Provide Concept and Detailed Design for On -Site Nitrogen Plant, Bulk Hydrogen, Oxygen, Argon and Helium Gas Supply Systems

Bulk Specialty Gas Systems

Bulk 20FT Highly Flammable Toxic, Corrosive Gas Storage and Supply Systems Design and Authorities Approval. Bulk HCl, SiH4, NF3, NH3,N2O.

Compressed Dry Air (CDA) System

The main components of a CDA system are the compressor, dryer, storage tank, air-main, distribution piping, connection piping and the tool connection. TPS Provide Energy efficient Compressed Dry Air (CDA) Systems Design.

Cleanroom Systems

Detailed Design for Energy Efficient cleanroom set-up for production or wafer storage. Providing Detailed Design for Make Up Air Supply, Chilled water systems, FFU, Dry coil , walkable Ceiling Systems, Cleanroom Floor and wall systems

Fire Protection System

Detailed design for Fire Protection as per NFPA and Local Fire Code , covering Foam System, ESFR for warehouse, Wet Sprinkler System, Pre-Action and Fire Alarm.

Process Exhaust Systems

Detailed Design for Point of Use Scrubbers, Flammable Gas Dilution Exhaust, General/Heat Exhaust, Explosion prevention Exhaust, ACID Scrubber Exhaust and Caustic Exhaust.

Our Projects

Perfection, Quality and Time delivery is our key factor. We have done several prestigious projects along the world

View All
View Project
700 SQM Class 6 Clean Room Expansion

Start Date :June 01 2021
Status: Finished

Address : Singapore

View Project
Concept Design of New FAB #2 (32000 SQM SITE AREA)

Start Date :November 01 2021
Status: Finished

Address : Singapore

View Project
King Abdullah University of Science and Technology

Start Date :June 01 2019
Status: Finished

Address : Saudi Arabia

View Project
Gas room set up at Siltronic H2 Bunker at REC CDA Plant at Soitec

Start Date :January 01 2018
Status: Finished

Address : Singapore

Our Clients