Singapore
+6580256430
sramanan@totalprocesssystems.com
Login
Register
Menu
Home
About us
Services
Blogs
gas
Fire
Building
Line of Activities
Semiconductor Fab Master Planning
Semiconductor Fab Cleanroom Expansion
Life Safety Systems (LSS)- Gas Leak
Hook Up Design
Process Exhaust
Point Of Use (POU) Abatement
Compressed Dry Air (CDA)
Process Cooling Water(PCW)
Make Up Air Unit (MAU)
Civil, Structure & Architecture (CSA)
Gas Systems
Projects
Contact us
Login
Register
Home
Line of Activities
Semiconductor Fab Cleanroom Expansion
Semiconductor Fab Cleanroom Expansion
Setting up a semiconductor FAB is very challenging for the semiconductor firms.
Challenges:
Complete the Cleanroom expansion within the time frame.
Overall Cost.
Authorities' approval.
Semiconductor Fab Cleanroom Expansion
Semiconductor Fab Cleanroom Expansion
Semiconductor Fab Cleanroom Expansion
Semiconductor Fab Cleanroom Expansion
Our Solution
Provide concept design -30%.
Submit for JTC/URA approval.
Detailed design of structure .
Award CSA contractor to start the construction.
All the Authorities clearance will be handled by TPS.
Verify the existing MAU and chilled water capacity.
Place order for Long Lead Items – Dry coil, FFU,MT Chilled water pump.
Develop installation Packages with 90% Detailed Design, Technical specification and BOQ.
Market Sourcing , Tender Review and Appoint Contractor.
Issue For Construction (IFC) Drawings.
Construction Management to make sure installation in line with Design Intend, Manage the Various order and complete the Installation ON TIME.