700 SQM Class 6 Clean Room Expansion
Client: SOITEC
Jun 2021-Dec 2023
Clean room expansion
Scope of Work:
Detailed Design Civil Structure & Architecture
Clean Room
Fire Protection Systems

Concept Design of New FAB #2 (32000 SQM SITE AREA)
Client: SOITEC

Life Safety Systems Design
Client :KAUST

Gas room set up at Siltronic H2 Bunker, REC CDA Plant, Soitec
Client: Air Liquide

Specialty Gas Systems and Bulk Gas Distribution Systems
Client: Tialoc
Jun 2021-Dec 2023
Gas Systems
Scope of Work:
Packages for Bulk Gas Systems
Speciality Gas Systems for AMS

Bulk Storage Gas Plant for 2% B2H6 Gas
Client: Exyte
Cleanroom Expansion
Jun 2021-Dec 2023

700 SQM Class 6 Clean Room Expansion
Client: SOITEC
Scope of Work:
Detailed Design Civil Structure & Architecture
Clean Room
Fire Protection Systems
Concept Design
Nov 2021-Dec 2022

Concept Design of New FAB #2 (32000 SQM SITE AREA)
Client: SOITEC
Scope of Work:
Concept Design
JTC, UDG Clearance
Safety Systems
Jun 2019- Dec 2019

Facility Systems
Jan 2018-Dec 2022

Gas room set up at Siltronic H2 Bunker, REC CDA Plant, Soitec
Client: Air Liquide
Scope of Work:
Selection
Design
EPI POU SCRUBBERS
Gas Systems
Jun 2021-Dec 2023

Specialty Gas Systems and Bulk Gas Distribution Systems
Client: Tialoc
Scope of Work:
Packages for Bulk Gas Systems
Speciality Gas Systems for AMS
Gas Storage design
Nov 2021-Dec 2022

Bulk Storage Gas Plant for 2% B2H6 Gas
Client: Exyte
Scope of Work:
Concept Design
JTC, UDG Clearance